首页 > 标准下载>IEC 62264-3-2016 企业控制系统集成--第3部分:制造过程管理的活动模型 Enterprise-control system integration -- Part 3: Activity models of manufacturing operations management免费下载
IEC 62264-3-2016 企业控制系统集成--第3部分:制造过程管理的活动模型 Enterprise-control system integration -- Part 3: Activity models of manufacturing operations management IEC 62264-3-2016 企业控制系统集成--第3部分:制造过程管理的活动模型 Enterprise-control system integration -- Part 3: Activity models of manufacturing operations management

IEC 62264-3-2016 企业控制系统集成--第3部分:制造过程管理的活动模型 Enterprise-control system integration -- Part 3: Activity models of manufacturing operations management

  • 标准类别:
  • 标准大小:
  • 标准编号:IEC 62264-3-2016
  • 标准状态:现行
  • 更新时间:2023-09-27
  • 下载次数:
标准简介

IEC 62264-3:2016 defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined in this document are consistent with the object models definitions given in IEC 62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level 4 functions and the process control functions, defined as the Level 2 functions of IEC 62264-1. IEC 62264-3:2016 defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined in this document are consistent with the object models definitions given in IEC 62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level 4 functions and the process control functions, defined as the Level 2 functions of IEC 62264-1. This second edition cancels and replaces the first edition published in 2007. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: a) 4.1 Manufacturing Operations Management was moved to Part 1 and therefore was removed from Part 3; b) 4.2 Functional hierarchy was moved to Part 1 and therefore was removed from Part 3; c) 4.4 Criterion for defining activities below Level 4 was moved to Part 1 and therefore was removed from Part 3; d) 4.5 Categories of production information was moved to Part 1 and therefore was removed from Part 3; e) 4.6 Manufacturing operations information was moved to Part 1 and therefore was removed from Part 3; f) 5.3 Expanded equipment hierarchy model was moved to Part 1 and therefore was removed from Part 3; g) 5.4 Expanded decision hierarchy model was removed from Part 3. The corresponding section was removed from Part 1 and replaced with a reference to ISO 15704; h) Annex A (informative) Other enterprise activities affecting manufacturing operations was moved to Part 1 and therefore was removed from Part 3; i) Annex D (informative) Associated standards was moved to Part 1 and therefore was removed from Part 3; j) Annex F (informative) Applying the decision hierarchy model to manufacturing operations management was removed from Part 3. The corresponding section was removed from Part 1 and replaced with a reference to ISO 15704; k) Annex G (informative) Mapping PSLX ontology to manufacturing operations management was removed from Part 3. The committee felt that this section is more appropriate as a PSLX white paper or TR. The names for data were changed to match the Part 4 standard names. These name changes were made in all figures and in the text. dition 2.0 2016-12 INTERNATIONAL STANDARD NORME INTERNATIONALE colour inside Enterprise-control system integration – Part 3: Activity models of manufacturing operations management Intégration des systèmes entreprise-contr?le – Partie 3: Modèles d’activités pour la gestion des opérations de fabrication IEC 62264-3:2016-12(en-fr) THIS PUBLICATION IS COPYRIGHT PROTECTED Copyright ? 2016 IEC, Geneva, Switz

标准截图
下一条:返回列表
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。