最终报告第3部分Section3-FINAL
- 资料类别:
- 资料大小:
- 资料编号:
- 资料状态:
- 更新时间:2021-09-09
- 下载次数:次
资料简介
该项目位于佛罗里达奥兰多附近的东奥兰奇县斯坦顿能源中心,占地3280英亩。项目设备将位于现有的燃煤机组和现有的天然气联合循环机组之间。该基地位于奥兰多东部城市边界以东约3英里处,位于市中心东南偏东约13英里处。
The proposed project would be located on a 35-acre portion of OUC’s existing 3,280-acre Stanton Energy Center in eastern Orange County near Orlando, Florida (Figure 2.1.1 and Figure 2.1.2). The project equipment would be situated between the existing coal-fired units and the existing natural gas-fired combined-cycle unit. The nearly level site is located approximately 3 miles east of the eastern city limits of Orlando and about 13 miles east-southeast of the downtown area.
资料截图
上一条:经济周期与中国住宅部门天然气需求的反应Economic Cycles and the Responsiveness of Natural Gas Demand in China’ s Resident
下一条:Mesaba能源项目环境影响报告草案第一卷第五章(2007)MESABA ENERGY PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT VOLUME 1Cha
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。
热门推荐
-
化学工程手册(第三版套装5册第1卷2卷3卷4卷5卷)袁渭康 王静康 费维扬 欧阳平凯 著 2021-09-09
-
石油化工自动控制设计手册(第四版) 黄步余 化工出版社 2020年 2021-09-09
-
化工过程模拟实训——Aspen Plus教程(第二版)孙兰义 化学工业出版社 2017年 2021-09-09
-
化工装置实用操作技术指南 韩文光2001年化学工业出版社 2021-09-09
-
HAZOP分析方法及实践 粟镇宇 化学工业出版社2018年 2021-09-09
-
工业除尘设备设计手册 张殿印 申丽 化工出版社 2012年 2021-09-09
-
回转窑(设计、使用与维修)沈阳铝镁设计院、长沙有色冶金设计院共同编写 2021-09-09
-
加拿大煤炭开采Coal Mining in Canada 2021-09-09
-
化工节能技术手册 王文堂 2006年化学工业出版社 2021-09-09
-
年终总结新年计划工作汇报PPT模板 2021-09-09