首页 > 资料下载 > 梅萨巴能源项目最终环境影响报告书第1卷MESABA ENERGY PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 1
梅萨巴能源项目最终环境影响报告书第1卷MESABA ENERGY PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 1 梅萨巴能源项目最终环境影响报告书第1卷MESABA ENERGY PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 1

梅萨巴能源项目最终环境影响报告书第1卷MESABA ENERGY PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 1

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-09
  • 下载次数:
资料简介

这份最终的环境影响报告(EIS)提供了有关拟议的Mesaba能源项目的潜在环境影响的信息,该能源项目是一个煤基综合气化联合循环(IGCC)发电设施,将位于明尼苏达州东北部的Taconite税收减免区(TTRA)。Excelsior Energy Inc. (Excelsior)提出将Mesaba能源项目分为两个阶段进行设计、施工和运营;每一阶段将名义上产生600兆瓦的电力(MWe)输出到电网,总计1200兆瓦。能源部提出的行动是提供总计3600万美元的联合资助,通过合作协议与精益求精的在清洁煤电倡议(CCPI)计划,设计和一年期操作示范测试段阶段即第一阶段的总成本是目前估计在21.6亿美元的合作协议。该EIS将Mesaba能源项目的两个阶段作为相互关联的行动来处理,即使只有第一阶段将由CCPI项目共同资助。美国能源部也可以根据2005年能源政策法案为项目第一阶段提供贷款担保。贷款担保的批准也被认为是需要接受《国家环境政策法》审查的一项重大联邦行动。

This Final Environmental Impact Statement (EIS) provides information about the potential environmental impacts of the proposed Mesaba Energy Project, a coal-based Integrated Gasification Combined Cycle (IGCC) electric power generating facility that would be located in the Taconite Tax Relief Area (TTRA) of northeastern Minnesota. Excelsior Energy Inc. (Excelsior) proposes to design, construct, and operate the Mesaba Energy Project in two phases; each phase would nominally generate 600 megawatts of electricity (MWe) for export to the electrical grid, 1,200 MWe total. DOE’s Proposed Action is to provide a total of $36 million in co-funding, through a cooperative agreement with Excelsior under the Clean Coal Power Initiative (CCPI) Program, for the design and one-year operational demonstration testing period for Phase I. The total cost of Phase I is currently estimated in the cooperative agreement at $2.16 billion. This EIS addresses the impacts of both phases of the Mesaba Energy Project as connected actions, even though only Phase I would be co-funded under the CCPI Program. DOE may also provide a loan guarantee to Excelsior pursuant to the Energy Policy Act of 2005 for Phase I of the proposed project. Approval of the loan guarantee is also considered a major Federal action subject to NEPA review.

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。