资料简介

Excelsior Energy, Inc.计划建造并运营一座煤炭原料综合气化联合循环(IGCC)发电厂。拟建的发电厂将分两期兴建;每个阶段将能够产生大约606兆瓦(净)的基载功率

Excelsior Energy, Inc. is proposing to construct and operate a coal-feedstock Integrated Gasification Combined Cycle ("IGCC") power plant. The proposed power plant will be constructed in two phases; each phase will be capable of producing approximately 606 MW (net) of baseload power